常見(jiàn)的低壓配電柜、高壓配電柜其實(shí)并不是單單指配電柜本身,它實(shí)際上是我們俗稱的
電氣成套設(shè)備,其實(shí)這種叫法是不準(zhǔn)確的,學(xué)名應(yīng)該是“成套配電裝置”。那么開(kāi)關(guān)柜為什么叫“成套配電裝置”?下面小編為您講解:
The common low-voltage distribution cabinet and high-voltage distribution cabinet are not only the distribution cabinet itself, but actually the electrical complete set of equipment we commonly call. In fact, this name is inaccurate, and the scientific name should be "complete set of power distribution device". So why is the switch cabinet called "complete power distribution device"? The following editor will explain to you:
成套配電裝置是以斷路器為主的電氣設(shè)備,成套配電裝置是制造廠成套供應(yīng)的設(shè)備,由制造廠預(yù)先按照主接線的要求,將每一回路的電氣設(shè)備高低壓電器(包括控制電器、保護(hù)電器、測(cè)量電器、如斷路器、隔離開(kāi)關(guān)、互感器等)以及母線、載流導(dǎo)體、絕緣子等,裝配在封閉或半封閉的金屬柜中,構(gòu)成各單元電路分柜,此單元電路分柜成為成套配電裝置。安裝時(shí),按主接線方式,將各單元分柜(又稱間隔)組合起來(lái),就構(gòu)成整個(gè)配電裝置。
The complete set of power distribution device is the electrical equipment mainly based on the circuit breaker. The complete set of power distribution device is the equipment supplied by the manufacturer in a complete set. The manufacturer assembles the high and low voltage electrical equipment (including control electrical equipment, protection electrical equipment, measuring electrical equipment, such as circuit breaker, disconnector, mutual inductor, etc.), bus, current-carrying conductor, insulator, etc. of each circuit in a closed or semi-closed metal cabinet according to the requirements of the main wiring in advance, Each unit circuit sub-cabinet forms a complete set of power distribution device. During installation, each unit and sub-cabinet (also called bay) are combined according to the main wiring mode to form the whole power distribution device.
在電器成套設(shè)備中把母線、隔離開(kāi)關(guān)(高壓)、刀開(kāi)關(guān)(低壓)、斷路器(空氣開(kāi)關(guān))、電壓互感器、電流互感器、電力變壓器、交流接觸器、保護(hù)繼電器(熱繼電器)、避雷器等組成的設(shè)備叫一次設(shè)備。由它們按照原理關(guān)系所組成的回路稱為一次回路或一次方案圖。
In the complete set of electrical equipment, the equipment consisting of bus, disconnector (high voltage), knife switch (low voltage), circuit breaker (air switch), voltage transformer, current transformer, power transformer, AC contactor, protective relay (thermal relay), lightning arrester, etc. is called primary equipment. The circuit composed of them according to the principle relationship is called primary circuit or primary scheme diagram.
為了使一次系統(tǒng)能可靠、穩(wěn)定地運(yùn)行,隨時(shí)監(jiān)視一次系統(tǒng)運(yùn)行狀態(tài),同時(shí)能隨時(shí)控制一次系統(tǒng)所必須配備許多其他電器元件及設(shè)備。如:測(cè)量?jī)x表(電流表、電壓表、功率因素表、功率表、頻率表等)、控制信號(hào)元件(信號(hào)燈、按鈕、轉(zhuǎn)換開(kāi)關(guān)等)、繼電保護(hù)裝置等。由它們按照原理關(guān)系所組成的回路稱為二次回路或二次方案圖。
In order to ensure the safe, reliable and stable operation of the primary system, monitor the operation status of the primary system at any time, and control the primary system at any time, many other electrical components and equipment must be equipped. Such as measuring instruments (ammeter, voltmeter, power factor meter, power meter, frequency meter, etc.), control signal elements (signal lamp, button, universal transfer switch, etc.), relay protection devices, etc. The circuit composed of them according to the principle relationship is called secondary circuit or secondary scheme diagram.
成套配電裝置的特點(diǎn)
Characteristics of complete power distribution device
1、成套設(shè)備有金屬外殼(柜體)的保護(hù),電氣設(shè)備和載流導(dǎo)體不易積灰,便于維護(hù),特別是對(duì)外處的污穢地區(qū)時(shí)更為突出。
1. The complete set of equipment is protected by a metal shell (cabinet). The electrical equipment and current-carrying conductor are not easy to accumulate dust and are easy to maintain, especially in the external polluted areas.
2、成套設(shè)備易于實(shí)現(xiàn)系列化、標(biāo)準(zhǔn)化、具有裝配質(zhì)量好、速度快、運(yùn)行可靠性高的特點(diǎn)。由于進(jìn)行定型設(shè)計(jì)和制作生產(chǎn),所以其結(jié)構(gòu)緊湊、布局合理、縮小了體積和占地面積,降低了造價(jià)。
2. The complete set of equipment is easy to realize serialization and standardization, and has the characteristics of good assembly quality, fast speed and high operation reliability. Due to the finalization design and production, the structure is compact, the layout is reasonable, the volume and floor area are reduced, and the cost is reduced.
3、成套設(shè)備的電器安裝、線路敷設(shè)與變配室的施工是分開(kāi)進(jìn)行的,縮短了基建的時(shí)間。
3. The electrical installation of the complete set of equipment, the line laying and the construction of the transformation and distribution room are carried out separately, which shortens the time of capital construction.
The above is the relevant answer to the question. I hope it can help you. If you don't know anything about it or need it, please come to our website http://m.ywf-lanzhou.com Ask about it!